PRIMAVERA P6 SCHEDULING

Primavera P6 Scheduling Services for Construction Contractors

Build, review, and maintain a logic-driven P6 schedule that reflects the work, supports contract submissions, and gives the project team a dependable view of the critical path.

THE ASSIGNMENT

A P6 schedule built around the contract and the field plan.

A useful Primavera P6 schedule is more than a list of activities. It should connect the contract milestones, work breakdown structure, procurement, submittals, approvals, construction sequence, and closeout into a logical network the team can explain and maintain.

CorePath supports contractors with focused P6 scheduling assignments—from building a new CPM schedule to reviewing an existing XER, updating progress, testing mitigation options, and preparing submission-ready schedule documents.

TYPICAL DELIVERABLES

What the project team can receive.

01

Native schedule files

Primavera P6 XER deliverables organized for review, update, and submission.

02

CPM schedule PDFs

Readable layouts showing activity dates, logic, float, milestones, and critical work.

03

Schedule narrative

A concise explanation of calendars, sequencing, assumptions, critical path, and key risks.

04

Schedule health review

Focused checks for open ends, constraints, lags, calendars, out-of-sequence work, and unusual float.

05

Progress updates

Actual dates, remaining durations, data-date control, variance review, and updated critical path.

06

Optional loading

Cost or resource loading when required by the contract and supported by available project data.

HOW THE WORK MOVES

A defined path from project need to usable deliverable.

The exact scope changes with the contract and available information. The working sequence stays transparent.

01

Review the requirements

We identify the schedule specification, milestones, submission format, level of detail, and immediate deadline.

02

Develop or assess the network

We build or review the WBS, activities, calendars, logic, constraints, and critical path against the planned means and methods.

03

Coordinate and refine

The project team reviews sequence, durations, procurement, access, and milestone assumptions before finalization.

04

Package the deliverable

We prepare the agreed native file, PDF layouts, narrative, and supporting reports for your review or submission.

QUALITY FOCUS

Checks that protect the usefulness of the schedule.

These are typical review points. Project-specific requirements are added from the contract and agreed scope.

  • Contract milestones represented
  • Logical start-to-finish network
  • Calendars and constraints reviewed
  • Procurement and submittals integrated
  • Critical and near-critical paths visible
  • Narrative aligned with the schedule
SERVICE FAQ

Questions before we start.

Start with the project situation. We’ll define the exact inputs and deliverables after reviewing the need.

Can you start from drawings and specifications?+

Yes. The required inputs depend on the assignment, but a new schedule commonly starts with the contract dates, scheduling specification, scope documents, planned sequence, and available procurement information.

Can you review an XER created by another scheduler?+

Yes. We can perform a focused schedule-health and compliance review, identify the main issues, and agree on corrections or the next update.

Do you also work in Microsoft Project?+

Yes. CorePath supports both Primavera P6 and Microsoft Project. We confirm the required native format before work begins.

Can support be limited to one submission?+

Yes. The scope can cover one baseline, one update, one review, or a recurring scheduling cycle.

BRING US THE CURRENT NEED

What is due, at risk,
or changing?

Share the project type, scheduling requirement, and immediate deadline. No files are required for the first conversation.