Native schedule files
Primavera P6 XER deliverables organized for review, update, and submission.
Build, review, and maintain a logic-driven P6 schedule that reflects the work, supports contract submissions, and gives the project team a dependable view of the critical path.
A useful Primavera P6 schedule is more than a list of activities. It should connect the contract milestones, work breakdown structure, procurement, submittals, approvals, construction sequence, and closeout into a logical network the team can explain and maintain.
CorePath supports contractors with focused P6 scheduling assignments—from building a new CPM schedule to reviewing an existing XER, updating progress, testing mitigation options, and preparing submission-ready schedule documents.
Primavera P6 XER deliverables organized for review, update, and submission.
Readable layouts showing activity dates, logic, float, milestones, and critical work.
A concise explanation of calendars, sequencing, assumptions, critical path, and key risks.
Focused checks for open ends, constraints, lags, calendars, out-of-sequence work, and unusual float.
Actual dates, remaining durations, data-date control, variance review, and updated critical path.
Cost or resource loading when required by the contract and supported by available project data.
The exact scope changes with the contract and available information. The working sequence stays transparent.
We identify the schedule specification, milestones, submission format, level of detail, and immediate deadline.
We build or review the WBS, activities, calendars, logic, constraints, and critical path against the planned means and methods.
The project team reviews sequence, durations, procurement, access, and milestone assumptions before finalization.
We prepare the agreed native file, PDF layouts, narrative, and supporting reports for your review or submission.
These are typical review points. Project-specific requirements are added from the contract and agreed scope.
Start with the project situation. We’ll define the exact inputs and deliverables after reviewing the need.
Yes. The required inputs depend on the assignment, but a new schedule commonly starts with the contract dates, scheduling specification, scope documents, planned sequence, and available procurement information.
Yes. We can perform a focused schedule-health and compliance review, identify the main issues, and agree on corrections or the next update.
Yes. CorePath supports both Primavera P6 and Microsoft Project. We confirm the required native format before work begins.
Yes. The scope can cover one baseline, one update, one review, or a recurring scheduling cycle.
Share the project type, scheduling requirement, and immediate deadline. No files are required for the first conversation.