Contract-aligned WBS
A clear structure organized around project phases, areas, trades, or required reporting levels.
Need a baseline schedule for a newly awarded project? CorePath prepares construction CPM schedules in Primavera P6 or Microsoft Project for contractors across the United States and Canada, with native files, PDF layouts, and a schedule narrative scoped to your contract requirements.
The baseline establishes how the project team intends to meet contractual dates. It should show a complete path through preconstruction, procurement, field execution, inspections, testing, turnover, and closeout—not just the visible construction activities.
Our construction baseline program preparation starts with your scheduling specification, drawings, contract milestones, and intended means and methods. We coordinate the work sequence with your team, then prepare the agreed schedule package for your review and owner submission. Final acceptance remains with the owner or reviewing authority.
A clear structure organized around project phases, areas, trades, or required reporting levels.
Activities connected through realistic relationships that produce traceable paths to milestones.
Long-lead items, reviews, approvals, fabrication, delivery, and enabling work tied to construction.
Contract dates, access dates, phasing requirements, and interim completion points represented and reviewed.
The editable native schedule in your agreed software, plus PDF layouts showing milestones, activity dates, float, and the critical path.
Written explanation of approach, calendars, assumptions, sequence, critical path, and key schedule risks.
Start with your project type, location, required software, and submission deadline. No documents are required to send the initial inquiry.
Before work starts, we agree on deliverables, review rounds, turnaround, and fee. Cost or resource loading is scoped separately when required.
Request a Baseline Consultation →This example shows possible work packages, not a completed client project or a ready-to-use CPM network. Activities and dependencies are developed for the actual contract.
Procurement and approvals can run alongside field work; the CPM network captures those relationships and their effect on completion.
After the baseline, schedule updates and reporting compare actual progress with the agreed plan. For contract-specific requirements, see federal construction scheduling.
The exact scope changes with the contract and available information. The working sequence stays transparent.
We review the scheduling specification, contract dates, scope, phasing, and required deliverables.
We capture the intended work sequence, production assumptions, access needs, procurement plan, and decision points.
We develop the network, calculate the schedule, and check logic, constraints, calendars, float, and milestone paths.
We incorporate project-team comments and prepare the agreed submission package.
These are typical review points. Project-specific requirements are added from the contract and agreed scope.
Start with the project situation. We’ll define the exact inputs and deliverables after reviewing the need.
Turnaround depends on scope, activity detail, available inputs, and review requirements. Tell us the submission deadline; we confirm a proposed delivery date and review allowance before the assignment begins.
Yes. Share the project type, location, required software, scheduling specification, and deadline. We clarify the deliverables, review rounds, fee, and exclusions before work begins.
Yes. We prepare baseline schedules for projects across both countries, using the contract requirements and project-team inputs to define calendars, milestones, and deliverables.
The right level of detail depends on the contract, project size, update cycle, and how the team will manage the work. We use the project specification and management needs to define it.
Yes, when they affect the construction sequence or contract requirements. Long-lead procurement should connect logically to the work it enables.
Yes. We can review owner or consultant comments, trace the affected schedule areas, and scope the required corrections.
The fastest start is the scheduling specification, contract dates, scope documents, planned sequence, key subcontractor input, and the submission deadline.
Share the project type, scheduling requirement, and immediate deadline. No files are required for the first conversation.